Offshore Wind
ULO provides grouting for monopile, transition-piece and jacket foundations across fleet-scale offshore-wind programs.
Operating requirements
Wind-farm installation depends on repeatable connection quality and predictable output within weather-limited installation schedules.
Delivery method
| Sequence | |
|---|---|
| Qualify for the fleet | A repeatable, licensed high-strength mix qualified to the specific connection design across the whole wind farm – the same result on turbine one and turbine one hundred. |
| Place at RJM speed | The Recirculating Jet Mixer’s high output lets crews grout connections fast, completing more per weather window and protecting the installation program. |
| Verify every unit | Each connection is monitored and documented, giving the developer fleet-wide confidence and a clean handover. |
ULO scope
Repeatable, documented grouted connections delivered across offshore-wind foundation programs.
- Monopile & transition-piece grouting
- Jacket-foundation grouting for wind
- Fleet-scale placement
- Cable protection & scour prevention
Selected project record
14 projects across 5 countries, with quantities as ULO records them. End users and EPCI clients are named where ULO named them.
| Project | Country | Operator | EPCI client | Scope |
|---|---|---|---|---|
| Fengmiao 1 offshore wind farm | Taiwan | Peak Wind | CDWE | 33 jacket foundations1 offshore substation |
| Hai Long offshore wind farm | Taiwan | Northland Power · Mitsui · Gentari | CDWE | 73 turbine foundations1,022 MW capacity2 offshore substations |
| Saint-Brieuc offshore wind farm | France | Iberdrola (Ailes Marines) | Van Oord | 62 jacket foundations & piles496 MW capacity |
| Zhong Neng offshore wind farm | Taiwan | CIP · China Steel (CSC) | CDWE | 31 turbines300 MW capacity |
| Moray West offshore wind farm | United Kingdom | Ocean Winds (EDPR · ENGIE) | Boskalis | 2 offshore substation platforms |
| Changfang & Xidao (CFXD) | Taiwan | CIP · COP | CDWE | 52 turbines600 MW capacity |
| Baltic Eagle offshore wind farm | Germany | Baltic Eagle GmbH | Heerema | 1 offshore substation |
| Hollandse Kust West – Alpha substation | Netherlands | TenneT | DEME | 1 offshore substation |
| Fécamp offshore wind farm | France | Eolien Maritime France | DEME (SDI) | 1 offshore substation |
| Hollandse Kust Noord – Beta substation | Netherlands | TenneT | Scaldis · DEME | 1 offshore substation |
| Hollandse Kust Zuid – Beta substation | Netherlands | TenneT | Heerema | 1 offshore substation |
| Moray East offshore wind farm | United Kingdom | Moray Offshore Windfarm (East) Ltd | DEME | 100 turbine jackets3 offshore substation jackets |
| Hornsea 2 offshore wind farm | United Kingdom | Ørsted | Heerema | 2 substation & reactive compensation jackets |
| Hollandse Kust Zuid – Alpha substation | Netherlands | TenneT | Heerema | 1 offshore substation |
Questions operators ask
What does ULO provide for offshore wind?
ULO grouts the connections between offshore-wind turbine foundations and their transition pieces or jackets, supplies licensed high-strength grout, and protects inter-array and export cables – at the fleet scale wind programs require.
Why does grouting speed matter for offshore wind?
Offshore-wind installation runs on tight, weather-dependent windows. Higher-output grouting completes more foundations per window, which directly protects the installation schedule and reduces vessel standby cost.
How many offshore-wind projects has ULO supported?
ULO has grouted foundations and offshore substations on 14 offshore wind projects in 5 countries, supporting 4,000+ MW of capacity, including projects in the Taiwan Strait and European North Sea programs.
